KKR Solid Surface - Custom solid surface manufacturer & acrylic solid surface sheet factory over 19 years

Waterproof and leak-proof tips for bathroom-bathroom, waterproof and leak-proof, tips

by:KKR Solid Surface     2022-05-18

Tip 1: Be sure to waterproof the wall. Before laying the wall tiles, waterproof the wall. In general waterproof treatment, the wall should be waterproofed at a height of 30 cm, but for a non-load-bearing light body wall, the entire wall should be waterproofed, at least 60 cm high. Skill 2: The joints between the wall and the ground and the ground joints of the pipes between the upper and lower water are more prone to problems. We must urge the workers to deal with these edges and corners, and the waterproof coating must be applied in place. . Tip 3: Resurfacing floor tiles for ground waterproofing. If you need to replace the original floor tiles in the bathroom, after chiseling the original floor tiles, you must first use cement mortar to level the ground, and then do waterproof treatment, so as to avoid the uneven thickness of the waterproof coating. resulting in leakage. Before doing waterproofing, be sure to clean the ground. Tip 4: Try not to damage the original waterproof layer. Generally, a waterproof layer is made on the ground of the newly delivered buildings. Therefore, if the original waterproof layer is not damaged, leakage will generally not occur. Tip 5: The decoration team is required to make cement mulch for the upper and lower water pipes of the bathroom, and apply a waterproof coating of 10 to 20 cm upward from the ground, and then redo the ester waterproofing on the ground, and add the original waterproof layer to form a composite waterproof layer. to enhance water resistance. Tip 6: The water pipe grooves in the wall should also be waterproofed. During the construction process, when pipes, floor drains, etc. pass through the floor, the waterproof layer around the holes must be carefully constructed. The water pipes are buried in the wall, and the layout is reasonable. The water pipes are laid in grooves larger than the diameter of the pipes. The plastering in the grooves is smooth, and then the grooves are painted with waterproof paint. Tip 7: Use a 24-hour water storage test to check the waterproofing. After the waterproofing project is completed, seal the door and the drain, and fill the bathroom floor with water to a certain level of liquid level, and make a mark. If there is no liquid level within 24 hours Significant decline, especially the roof of the house downstairs did not leak, the waterproofing is qualified.

Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...